Power Supply for a Nigerian Gold Mine
4 x 500kVA Cummins generators with parallel control deliver reliable off-grid power in a remote mining environment.
Mid-tier gold mining company
Niger State, Nigeria
4 x 500kVA
2023
The Challenge
The mine is located 180 km from the nearest town with no grid connection available. The site required a continuous 1,400kVA baseload for crushing mills, ball mills, heap-leach pumps, and worker camp facilities, plus headroom for starting large induction motors.
Dust, ambient temperatures up to 43°C, and poor road access made transport and cooling major concerns. Fuel logistics dictated that the plant needed to operate for at least 5 days between diesel deliveries, requiring on-site bulk storage of 80,000 liters.
Our Solution
We supplied four 500kVA Cummins KTA19-G4 generator sets in heavy-duty weatherproof canopies with cyclone air cleaners and oversized radiators. The sets operate in an N+1 parallel configuration controlled by a ComAp Intellisys system, allowing any one unit to be taken offline for service while the remaining three carry the full site load.
A 100,000-liter double-wall bulk fuel tank was installed with automated fuel polishing and leak detection. The exhaust system used high-temperature resistant mufflers and was routed 8 meters above ground to dissipate heat away from the powerhouse.
Our commissioning engineer stayed on site for 21 days, training the local mechanical team on daily checks, filter replacement, and load-sharing calibration.
Results & Performance
2+ yr
Continuous operation
0
Production stops
85%
Average load factor
Commissioned in June 2023, the plant has run continuously for over two years. Monthly availability reports show 99.7% uptime, with planned shutdowns limited to routine oil and filter changes. The mine has reported zero production losses attributable to power failure.
Fuel consumption is tracked daily via the ComAp controller and averages 318 liters per hour across the running units. This matched our fuel curve estimate within 4%, giving the client confidence in their operating budget.
Technical Configuration
| Generator model | Jinjia JP-C500 (Cummins KTA19-G4) |
| Total installed | 4 x 500kVA / 400kW |
| Parallel control | ComAp Intellisys (IG-NT) |
| Voltage / frequency | 415V / 50Hz / 3-phase |
| Fuel storage | 100,000-liter double-wall tank |
| Cooling | Oversized radiator + tropical louvers |
| Air filtration | Cyclone pre-cleaner + heavy-duty filter |
| Remote monitoring | WebSupervisor + SMS alerts |
Project Team
Engineer Zhang Hao
Senior Mining Power Engineer
Zhang Hao has commissioned diesel power plants for 20+ mining sites in West Africa. He is certified by Cummins for KTA19 and QSK series engines and specializes in parallel systems for harsh environments.
Related Project Cases
Emergency Power for Accra Teaching Hospital, Ghana
Jinjia Power supplied 2 x 500kVA Perkins silent generators with ATS for a 500-bed teaching hospital in Accra, Ghana. JCI...
Read full case study
Backup Power for a Jakarta Data Center
Jinjia Power supplied 2 x 1000kVA containerized Cummins generators with N+1 redundancy for a Tier-III data center in Jak...
Read full case study
Prime and Backup Power for a Vietnam Textile Factory
Jinjia Power installed 3 x 625kVA Cummins silent generators with grid synchronization for a major textile factory in Vie...
Read full case studyNeed a Similar Power Solution?
Share your project requirements and our engineers will design a customized generator system for your site.