Backup Power for a Jakarta Data Center
2 x 1000kVA containerized Cummins generators provide N+1 redundancy for a Tier-III facility.
Cloud and colocation provider
Jakarta, Indonesia
2 x 1000kVA
2024
The Challenge
The data center hosts financial and e-commerce platforms requiring 99.999% uptime. Indonesian grid stability in the area was insufficient, with voltage sags and monthly outages lasting 30 minutes to 4 hours.
The client required a backup power architecture that could start and accept full load within 10 seconds, operate in a 35°C environment with 80% humidity, and fit within a limited outdoor compound adjacent to the building.
Our Solution
We delivered two 1000kVA Cummins QST30-G5 generators in 40-foot high-cube containers with integrated fuel tanks, louvers, and sound attenuation. The container design allowed installation on a flat concrete pad without needing a dedicated engine room.
The units are synchronized through a Deepsea DSE8660 parallel controller and connected via a closed-transition ATS to avoid even momentary interruption during test runs. Each container is fitted with dehumidifiers and space heaters to protect controls from tropical humidity.
Before handover, we performed a full-load step-load test, a 24-hour continuous load-bank test, and multiple mains-failure simulations witnessed by the client's Tier-III certification auditor.
Results & Performance
<10s
Full load acceptance
99.999%
Uptime maintained
72h
Fuel autonomy
Since going live in January 2024, the backup system has experienced 11 automatic starts due to grid events. Every start reached stable voltage and frequency within 6 seconds, and full load transfer was completed within the 10-second SLA. The facility has maintained its 99.999% uptime commitment.
Sound levels at the property boundary measure 68 dB(A), satisfying the local environmental permit. The client has since placed a follow-on order for a third 1000kVA unit to support a planned expansion.
Technical Configuration
| Generator model | Jinjia JP-C1000C (Cummins QST30-G5) |
| Total installed | 2 x 1000kVA / 800kW |
| Configuration | N+1 redundant |
| Voltage / frequency | 11kV / 50Hz via step-up transformer |
| Container type | 40ft HC soundproof container |
| Parallel control | Deepsea DSE8660 |
| ATS type | Closed-transition ATS |
| Fuel autonomy | 72 hours at full load |
Project Team
Engineer Wang Lin
Data Center Power Solutions Lead
Wang Lin has designed backup power systems for 15+ data centers in Asia. He holds Cummins QSK certification and specializes in closed-transition ATS and Tier-III compliance testing.
Related Project Cases
Emergency Power for Accra Teaching Hospital, Ghana
Jinjia Power supplied 2 x 500kVA Perkins silent generators with ATS for a 500-bed teaching hospital in Accra, Ghana. JCI...
Read full case study
Power Supply for a Nigerian Gold Mine
Jinjia Power delivered a turnkey 4 x 500kVA Cummins parallel generator plant for a remote Nigeria gold mine. 24/7 off-gr...
Read full case study
Prime and Backup Power for a Vietnam Textile Factory
Jinjia Power installed 3 x 625kVA Cummins silent generators with grid synchronization for a major textile factory in Vie...
Read full case studyNeed a Similar Power Solution?
Share your project requirements and our engineers will design a customized generator system for your site.